This website contains cookies. Continuing to browse our website implies acceptance of their use. More information | Accept
es en

Projects


Results can be filtered by project type using the following drop-down menu

CENTRO COMERCIAL MEGAPLAZA 1

MEGAPLAZA JAEN SHOPPING CENTER

Peru, JAEN · 2015
Categoy: Commertial building, SHOPPING CENTER
Construction surface (m2): 10.000
Specialization: FP, PUMP
Detection and extinguishing system using a 2.000 GLP pump, sprinkler network, cabinets and fire hydrants.
CENTRO COMERCIAL MEGAPLAZA 1

MEGAPLAZA HUARAL SHOPPING CENTER

Peru, HUARAL · 2016
Categoy: Commertial building, SHOPPING CENTER
Construction surface (m2): 12.000
Specialization: FP, PUMP
Detection and extinguishing system using a 2.000 GLP pump, sprinkler network, cabinets and fire hydrants.
CENTRO COMERCIAL MEGAPLAZA - VILLA EL SALVADOR 1

MEGAPLAZA VILLA EL SALVADOR SHOPPING CENTER

Peru, LIMA · 2016
Categoy: Commertial building, SHOPPING CENTER
Construction surface (m2): 18.000
Specialization: FP, SAFETY, PUMP
Detection and extinguishing system using a 750 GLP pump, sprinkler network, cabinets and fire hydrants. CCTV system comprised of 39 BOSCH cameras, intruder and access control systems.
CENTRO DE MANTENIMIENTO AERONAUTICO DEL EJERCITO DEL PERU 1

AIRFORCE MAINTENANCE CENTER OF THE ARMY OF PERU

Peru, AREQUIPA · 2017
Categoy: Institutional building, BUILDINGS
Construction surface (m2): 77.500
Specialization: FP, PUMP
Extinguishing system using a 2000 GLP pump, sprinkler network, cabinets, fire hydrants and fast-action cabinets. One clean agent system and two foam systems for two helicopter buildings.
CORONA PLAZA CENTRO COMERIAL 1
CORONA PLAZA CENTRO COMERIAL 2

CORONA PLAZA SHOPPING CENTER

Peru, TUMBES · 2016
Categoy: Commertial building, SHOPPING CENTER
Construction surface (m2): 6.000
Specialization: AIR CONDITIONING, VENTILATION, PUMP
Installation of 1 air-cooled chiller with a capacity of 100 Tn and two water-cooled chillers with a capacity of 500 Tn each. Two 500 Tn cooling towers. 15 cold water pumps and 3 condensate pumps. Pressurizing of 4 stairs. Monoxide extraction system for two basement levels. BMS system and centralized control.
EDIFICIO MORRO SOLAR 1
EDIFICIO MORRO SOLAR 2

MORRO SOLAR BUILDING

Peru, LIMA · 2016
Categoy: Residential building, OFFICE BUILDINGS
Construction surface (m2): 25.000
Specialization: SAFETY
Detection system, CCTV for 48 cameras, access control, automation and BMS.
HOTEL COSTA DEL SOL 1

COSTA DEL SOL TUMBES HOTEL

Peru, TUMBES · 2016
Categoy: Residential building, HOTELS
Construction surface (m2): 1.500
Specialization: AIR CONDITIONING
Air conditioning of 32 rooms, entrance hall and service area.
HOTEL COSTA DEL SOL -  SALAVERRY 1

COSTA DEL SOL SALAVERRY HOTEL

Peru, LIMA · 2014
Categoy: Residential building, HOTELS
Construction surface (m2): 7.200
Specialization: FP, PUMP
Extinguishing system using a 750 GLP pump, sprinkler network and cabinets for 5 basements and 14 stories.
12 13 14 15 16