WAREHOUSE OF LOGISTICS CENTER FOR ZARA ARGENTINA
Argentina, TORTUGAS, BUENOS AIRES
· 1999
Categoy: Industrial building, LOGISTICS CENTERS
Installed power (KW): 4.536
Construction surface (m2): 30.000
Specialization: HEATING, VENTILATION, SOUND SYSTEM, ELECTRICITY, FP, SAFETY, VAPOR GENERATION, PUMP GROUP
Installation of heating by means of natural gas boilers used for the production of hot water and its distribution to aerothermal-type terminal elements located inside the logistics center. Forced ventilation system comprised of mushroom-type air-impulse fans and extractors located on the roof as well as heating in the central building. Steam generation plant with natural gas boiler for the production of dry steam at the garments ironing center in the logistics center building. Generation of compressed air for the garments conveyor line. Automated fire detection system equipped with heat detectors and a central station comprising 60 areas. Fire extinguishing systems comprising sprinklers and hand-held extinguishers. Diesel-powered main pump group and electric jockey pump. Network of equipped fire hydrants. Installation of a security system comprised of dome-type and fixed-type surveillance cameras as well as movement sensors inside the building and perimeter sensors along the outside area. Evacuation, signs and loudspeakers..